Columbus Blue JacketsSyracuse Crunch Home
 

Turning Stone Casino
CNY Eye and Tissue Bank Re/Max Masters

News: 2009-10 Season

Mirabito Outdoor Classic Preparations - January 15

Syracuse, NY, (Friday, January 15, 2010)
Preparations continue to take place out at the New York State Fairgrounds. The sandbox construction is well underway after parts of the frame were put into place and sand was delivered. In addition, title sponsor Mirabito Energy Services is on the site to place furnaces in the building which will become the locker rooms. This building does not currently have any means of heat and Mirabito is helping to make the building functional for this game.

Today, Jeff Mickle of the Syracuse Convention and Visitors Bureau toured the site along with Crunch season ticket holder Kelly Morehouse. Both were shown the many details going into the project.

This historic project will continue to be documented throughout the process right here on SyracuseCrunch.com, as well as on Twitter at twitter.com/SyracuseCrunch.

Since January 4, barriers were moved into place to create a wall for the crushed stone to settle against, protective material was laid to protect the track and truck loads of crushed stone were delivered in order to level out the race track's 24 degree slope. As of Monday morning (January 11), the barriers were removed and preparation has begun in order to build  a "sand box" which will be built on top of the stone and will soon become the base of the ice surface.

To view today's progress at the Fairgrounds, click here to take a look.